鲍鱼直播

architecture - engineering - construction
鲍鱼直播

About HDPE

HDPE

Product Overview

  • Application: Chilled Water, Condenser Water, Domestic Water, Potable Water, Waste Water
  • Service Pipe: High Density Polyethylene (HDPE)
  • Insulation: Polyurethane Foam
  • Temp: Up to 75掳F (24掳C)
  • Nom Length: 20 Ft. 鈥 40 Ft.

System Specifications

Pipe Size Minimum Insulation Thickness HDPE Jacket O.D. HDPE Jacket Wall
3鈥 1.43鈥 6.63鈥 .150鈥
4鈥 1.58鈥 8.00鈥 .150鈥
6鈥 1.51鈥 10.00鈥 .175鈥
8鈥 1.73鈥 12.43鈥 .175鈥
10鈥 1.48鈥 14.06鈥 .175鈥
12鈥 1.39鈥 15.87鈥 .175鈥
14鈥 1.72鈥 17.83鈥 .175鈥
16鈥 1.70鈥 19.80鈥 .200鈥
18鈥 1.89鈥 22.17鈥 .200鈥

Product Description

Service Pipe: All service pipes shall be High Density Polyethylene (HDPE) with the properties as listed below. Pipe and fittings are manufactured from polyethylene and fabricated to Standard Dimension Ratio (SDR) wall thickness.

HDPE carrier pipe materials & properties:

  • Std. Spec. for Polyethylene Plastic Pipe (SDR-PR) based on OD. ASTM F-714
  • Resin Type III, Grade P34, Cat. 5, CL C 鈥 ASTM D-3350
  • Long Term Hydrostatic Strength 1600 psi 鈥 ASTM D-2837
  • Std. PE for Water Distribution 4鈥-63鈥 鈥 AWWA C-906

Insulation: The insulation shall be a foamed-in-place closed-cell polyurethane which completely fills the annular space between the carrier pipe and the exterior casing. The insulation shall have the following physical properties:

  • Minimum Density (lb./cu. ft.) 2.0 ASTM D-1621
  • 90-95 % Closed Cell ASTM D-2856
  • 鈥淜鈥 Factor BTU/Hr. sq. ft. 掳F/in. . . .147 ASTM C-177
  • Maximum operating temperature shall not exceed 75掳F.

Exterior Casing: The casing shall be High Density Polyethylene (HDPE) with the following properties:

  • ASTM D-3350 Resin Type III, Grade P34
  • ASTM D-638 Ultimate Elongation 850%
  • ASTM D-638 Tensile Yield Strength 3300 psi
  • ASTM D-790 Tangent Flexural Modules 175,000 psi

Sub-Assemblies: All fittings shall be HDPE, factory insulated and fusion welded to the HDPE service pipe and sealed to the outer jacket. Field-installed fittings are insulated and sealed with our supplied insulation kits.

Field Joints: After thermal butt fusion welding and hydrostatic testing of the carrier pipe, HDPE jacketed straight field joints shall be insulated with polyurethane foam half-shells to the thickness specified, and sealed water-tight with a heat-shrink sleeve.

Installation: No piping shall be installed in standing water. Trenches shall be maintained dry until final field closure is complete. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The carrier piping shall be hydrostatically tested to 1-1/2 times the operating pressure, or as specified in the contract documents. The test shall be maintained for a minimum time of 1 hour. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM.

Backfill: A 4-inch layer of sand or fine gravel, less than 陆鈥 in diameter, shall be placed and tamped in the trench to provide uniform bedding for the HDPE system. Once the system is in place, the trenches shall be carefully backfilled with similar material and hand tamped in 6鈥 layers until a minimum of 12鈥 above the top of the pre-insulated pipe has been achieved. The remainder of the backfill shall be void of rocks, frozen earth, and foreign material. The trench shall be compacted to comply with H-20 Highway loading.


Request for Information / Request a Catalog from Tricon Force Piping Solutions LLC about HDPE
 
(Please check companies and/or products above.)
 
*Name:    
*Email:    
Company:    
*Type:    
Phone:    
*Address:    
*Request:    
    (* = Mandatory field) 
Please add me to the mailing list for the free monthly e-Newsletter AECnews.  
     


News archive:
Tricon Poly (Apr 15, 2018)
Tricon Poly (Jan 04, 2017)
Tricon Poly from Tricon Piping Systems (Jun 30, 2015)