About Steel 300
Steel 300
Service Pipe: Carbon steel service pipe shall be standard weight A53 ERW or A106 seamless beveled for welding. Condensate return piping shall be Schedule 80. Stainless Steel piping shall be Type 304L or 316L. ASTM A312/A312M. All joints for pipe 2Β½β and larger in size shall be butt-welded. Sizes 2β and smaller shall be socket welded. Straight lengths of piping will be supplied with 6β of piping exposed at each end for field joint fabrication. Pipe lengths to be supplied in 21-42 ft. lengths. Insulation: The insulation shall be a foamed in place closed-cell polyisocyanurate which completely fills the annular space between the carrier pipe and the exterior casing. The insulation shall have the following physical properties: Exterior Casing: The exterior casing shall be High Density Polyethylene (H.D.P.E.) ASTM D-1248 with the following physical properties: No polyethylene tape casings will be allowed. Sub-Assemblies: All fittings, anchors, end seals, and other accessories shall be prefabricated or field fabricated depending on engineerβs option and/or site conditions. Fittings 2-1/2β and larger to be butt weld conforming to ASTM A234 WPB & ASME B 16.9. Fittings 2β and smaller to be socket weld conforming to ASME B 16.11. All factory fabricated fittings shall be welded to B 31-1. Field Joints: After welding and hydrostatic testing, HDPE jackets will use polyisocyanurate foam to the thickness specified and a heat shrinkable sleeve. Expansion Compensation: Expansion and contraction within the piping system shall be accommodated with factory prefabricated external flexible foam bolsters for expansion elbows, z-bends, expansion loops, and anchors specifically designed for each application. Leak Detection: The system can be made leak detection ready. This is accomplished by installing a bare copper wire between the carrier pipe and the HDPE jacket at the factory. The wire will be embedded in the foam insulation and incorporated into each piece of pre-insulated pipe and fittings. Contractor shall check continuity and electrical isolation of each piece of insulated pipe and fittings with a standard ohmmeter. Copper wires are to be connected together at each field joint with an insulated jumper cable as provided by Tricon. Installation: No piping shall be installed in standing water. Trenches shall be maintained dry until final field closure is complete. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The carrier piping shall be hydrostatically tested to 1-1/2 times the operating pressure, or as specified in the contract documents. The test shall be maintained for a minimum time of 1 hour. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM.Product Overview
System Specifications
Pipe Size
Minimal Insulation Thickness
HDPE Jacket O.D.
HDPE Jacket Wall
Β½β
2.70β
6.63β
.200β
ΒΎβ
2.58β
6.63β
.200β
1β
2.46β
6.63β
.200β
1ΒΌβ
3.00β
8.00β
.175β
1Β½β
2.88β
8.00β
.175β
2β
2.64β
8.00β
.175β
2Β½β
2.40β
8.00β
.175β
3β
3.08β
10.00β
.175β
4β
2.56β
10.00β
.175β
5β
3.26β
12.43β
.175β
6β
2.73β
12.43β
.175β
8β
2.54β
14.06β
.175β
10β
3.34β
17.83β
.175β
12β
2.34β
17.83β
.175β
14β
2.70β
19.80β
.200β
16β
2.89β
22.17β
.200β
Product Description