About Composite
Composite
Service Pipe: Carbon steel service pipe shall be standard weight A53 ERW or A106 seamless beveled for welding. Condensate return piping shall be Schedule 80. All joints for pipe 2陆鈥 and larger in size shall be butt-welded. Sizes 2鈥 and smaller shall be socket welded. Straight lengths of piping will be supplied with 6鈥 of piping exposed at each end for field joint fabrication. Where possible, piping lengths shall be supplied in 40 Ft. random lengths. Insulation (Inner Layer): The inner layer of insulation will consist of cellular glass, calcium silicate, or perlite. Insulation (Outer Layer): The outer conduit insulation shall be polyurethane foam with a minimum 1-inch thickness. The polyurethane foam shall have a minimum density of 2.0, and a closed-cell content of 90% to 95% per ASTM D-2856, and shall have a 鈥淜鈥 factor of .14 per ASTM C-177 @ 75掳F. Exterior Casing: The exterior casing shall be seamless, extruded High-Density Polyethylene (H.D.P.E.) ASTM-1248, with the following physical properties: No polyethylene tape casings will be allowed. Sub-Assemblies: All fittings, anchors, and end seals shall be factory fabricated and insulated. No field fabrication of fittings, anchors, or end seals will be allowed. Field Joints: After welding and hydrostatic testing, all field joints shall be insulated with insulation materials as supplied by Tricon Piping Systems, Inc. Expansion Compensation: Expansion and contraction within the piping system shall be accommodated with factory-fabricated oversized elbows, z-bends, and loops. Installation: Trenches shall be maintained dry until final field closure is complete. Piping system not suitable for use in a high water table. The installing contractor shall handle the piping system in accordance with the directions furnished by the manufacturer and as approved by the architect and engineer. The service piping shall be hydrostatically tested to 1-1/2 times the operating pressure, or as specified in the contract documents. The test shall be maintained for a minimum time of 1 hour. EXERCISE DUE CARE WHEN INSTALLING AND TESTING THE PIPING SYSTEM. Backfill: A 4-inch layer of sand or fine gravel shall be placed and tamped in the trench to provide stable and uniform bedding for the piping system. Once the system is in place, the trenches shall be carefully backfilled and hand tamped in 6鈥 layers until a cover of at least 24鈥 from the top of the pipe has been achieved. The first 12鈥 of backfill shall be sand or fine gravel less than 陆鈥 in diameter. The remainder of the backfill shall be void of rocks, frozen earth, and foreign material over 6鈥 in diameter. The trench shall be compacted to comply with H-20 Highway loading. Accessories: System Options:Product Overview
System Specifications
Pipe Size
Nominal Inner Insulation Thickness
Nominal Outer Insulation Thickness
HDPE Jacket O.D.
System Temperature
2鈥
1陆鈥
1.00鈥
8.00鈥
353掳贵
2陆鈥
2.00鈥
1.00鈥
10.00鈥
353掳贵
3鈥
2.00鈥
1.00鈥
10.00鈥
353掳贵
4鈥
2.50鈥
1.00鈥
12.43鈥
353掳贵
6鈥
2.50鈥
1.00鈥
14.06鈥
353掳贵
8鈥
2.50鈥
1.50鈥
17.83鈥
353掳贵
10鈥
3.00鈥
1.50鈥
19.80鈥
353掳贵
12鈥
3.00鈥
1.50鈥
22.17鈥
353掳贵
Product Description
News
News archive:
Tricon Composite Pipe System (Jul 28, 2023)
Tricon Composite (Jun 02, 2017)
Tricon Composite (Jan 11, 2016)
Featured Product: Tricon Composite (Feb 08, 2014)